That’s the way I would have read that one.
I’ve opened quite a few of them, not paying attention to what the actual part is, and I can’t quite get may head around this assumed vision.
Someone, sitting at a desk gets word that the factory floor needs 5 more widgets, hand writes a purchase order to one of the multitude of suppliers and what, mails it off?
Hard to imagine that as late as the ‘80s a large manufacturer operated that way.
Or am I missing something?
Kurt K
'85 XLT Lariat, ‘95 4.9L, Sniper 2300 on an Offy C, ‘97 4R70W w/ Quick 4, 3.08LS, DSII, 130a 3G, PMGR, '87 MC, P235/R75